You don't have javascript enabled. Good luck with that.
Pencarian
PPSU Kebagusan Kuras Saluran di Jalan Kebagusan Raya

Channel on Jalan Kebagusan Raya Dredged

Five PPSU personnel dredged mud from channel on Jalan Kebagusan Raya, RT 07/06, Kebagusan Urban Village, Pasar Minggu, South Jakarta.

The channel is full of mud. It causes water overflowing on the road when it rains

Kebagusan Urban Village Secretary, Mohammad Yohan said, the channel has depth of 20 centimeters and length of 150 meters. Dredging work was carried out manually using hoe and shovel.

"The channel is full of mud. It causes water overflowing on the road when it rains," he conveyed, Wednesday (8/25).

Progress of Kebun Raya PHB Channel Dredging Work Now Reaches 85 Percent

By dredging the channel, he expected the channel could accommodate more water during high and long-intensity rain.

"Channel dredging work is carried out to follow up resident's request to prevent inundation," he stated.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5425 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4581 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1775 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye997 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye954 personAldi Geri Lumban Tobing